THE closure of the A59 at Kex Gill between Bolton Abbey and Blubberhouses will result in changes to some Saturday bus services from Skipton while the road remains closed.
Bus X75 from Skipton to Harrogate will continue to depart at 11.15am, 2.15pm and 4.35pm on Saturdays, but return buses from Harrogate will be changed slightly to run at 9.55am, 12.20pm and 3.20pm.
Buses will run non-stop between Bolton Bridge and Harrogate and will not serve Blubberhouses or Kettlesing Head.
Meanwhile, regular users of service 14 between Embsay and Skipton should look out for a different bus on Saturdays as their usual bus will be replaced by a minibus.
Full details of these changes are available online at www.dalesbus.org
The road was closed on Tuesday after significant movement was identified in the hillside, resulting in substantial cracks on the slope.
A county council geotechnical engineer has carried out a detailed inspection of the ground and the road will remain closed until the results of the survey have been carefully examined.
A diversion route has been put in place and is signposted between Skipton and Harrogate. For more information, visit northyorks.gov.uk/roadworks and search the interactive map for Kex Gill.